
Wuxi Huaqiang Feed Machinery Co.,Ltd
Add:Donghu Industrial Park, Donghu Village, Donggang Town, Xishan District, Wuxi City, Jiangsu Province
Tel:+86-0510-83780085
Fax:+86-0510-83780805
E-mail:sales@huaqiangjx.com
1. Before using the feed mixer, you need to perform a thorough cleaning and inspection of the whole machine, adjust the belt tightness, then connect the power supply, rotate in the direction of the sign, and adjust the "compression screw" of the pressure wheel to 0.1 between the pressure wheel and the template. —0.3 mm.
2. When testing the machine, take 15 kilograms of powder (calculated as 200C, 5 kilograms less for small size and 5 kilograms for large size). It is recommended to use rice bran, or 5 kilograms of peanut meat and 15 kilograms of wheat husk, test pressure and repeatedly squeeze. After 15 minutes, the feed in the template hole can not be pressed out. Use a vise to clamp the steel nails (not to use pointed steel nails, and grind the steel nail heads) through the feed, and then squeeze it until the material is discharged normally.
If the user's own formula feed cannot be pressed, open the feed material in the mold hole, put some food oil on the flat mold surface, press the above-mentioned rice husk or peanut meat plus wheat husk feed, and then add fine sand (Sand for construction) Repeatedly squeeze for 10 minutes until the material is discharged normally.
3. The length of the pellet feed can adjust the up and down position of the recording and cutting knife. If the feed machinery manufacturer changes the template, it can remove the hopper to remove the barrel, remove the pressure wheel and cutter, unscrew the gong cap on the spindle, and use the accessory " The flat mold is lifted out of the “tensioner” (the template can be used on both sides, generally turned over after processing 50,000 kg, and used for 105A 25,000 kg).
4. In order to better carry out safe production, after removing the box cover, you must first cut off the power supply and turn off the machine switch before you can touch the template of the pressure roller with your hands and other tools. When the machine is rolled to 20,000 kg, the pressure roller is removed for cleaning and maintenance of the copper lubricating oil, and a comprehensive maintenance and refueling is carried out every six months.
5. Please install a grounding device for motors that use motors. For models that use motors, customers must install overload protection devices.


